Senior Week 24
- reidpacini18
- Mar 5
- 1 min read
This week I continued working on the CD organizer project and started wrapping things up. I started the week by finishing some new designs that I started at the end of last week. Unfortunately there were some issues importing those as DXFs into Inkscape which I think had something to do with the splines after looking it up.

After running into these issues I decided to go back to using one of my original designs that was square and did not use the splines. this design imported into Fusion fine and I faced no problems.

I also was able to bring some of my CD cases into school on Thursday to measure them and make sure the measurements I already had were correct. Once I measured them I realized that both the width and the length of the slots on the holder were a little too small so i fixed those before I exported the pieces to Inkscape to get ready to cut them.



Comments